Product
productExhibition/productExhibition Navigation//
productHome Appliance Front-Loading Washing Machine Drum Production Line
Image 2Image 3Image 4
Image 1
Preview
Basic Info.Product DescriptionCertifications

Basic Info.

Model NO.WM-01
ConditionNew
AutomationAutomation, Semi-Automatic
After-sales ServiceNegotiable, Engineers Available to Service Machinery Overseas
Transmission TypeFlexible
Automatic Production LineAssembly
CertificationISO
Flexible ProductionIntelligent Manufacturing
RhythmFlow Production Line
Production ScopeParts Production Line
Warranty12 Months
Transport PackageWooden Cases, Vacuum Packing, Anti-Rust Oil
TrademarkIDO
OriginChina

Product Description

Washing Machine Drum Assembly Line by Wuxi IDO Technology
Line Layout
detail
Preview
detail
Preview
Notes:
1. Cycle: 25S/p
2. LABOR REQUIRED: 5 PERSONS
Notes:1. Cycle: 25S/p2. LABOR REQUIRED: 5 PERSONS
detail
Preview
detail
Preview
detail
Preview
detail
Preview
Machine list of the whole line
Machine Details
detail
Preview
detail
Preview
-ST 2
V-bending & lock-seaming
Main actions:
1. The sheet is pushed into the machine by the servo pushing mechanism for positioning.
2. Bending knives on both sides begin to punch for V-bending.
3. The arms act for sheet rolling, and the inner support holds the drum wrapper tightly.
4. Start lock-seaming and take out the drum wrapper after completion
Main structure:
1 Material positioning and clamping
-Drive: Servo motor
-Positioning datum: positioning block
2
V-shaped bending
-Drive: hydraulic
-Bending knife lifting: hydraulic + rail slider + guide column and bush
3 Rolling and lock-seaming
- Rolling drive: cylinder
- Tightening drive: servo + roller screw
- Seaming drive: hydraulic + guide column and bush
Main parameters:
1. Blank thickness: 0.4-0.6mm (different thickness needs to switch the riveting die)
2. Material width: 300-500mm
3. Maximum tensile strength: 5500N/50mm (standard test method)
4. Production beat: 25s
detail
Preview
detail
Preview
ST4: Flanging
1. After the drum is placed on the support mold of the flanging machine, the support mold supports the drum tightly.
2. The supporting cylinder descends and the supporting mold rotates.
3. The flanging wheel group feeds for flanging, and returns after the flanging is completed.
1 Support mold
-Tightening drive: cylinder
-Tightening mechanism: connecting rod mechanism
2 Drum holder transverse
-Rotation drive: geared motor
-Actuator: sprocket and chain mechanism
3 Drum holder clamping
-Clamp drive: cylinder
1.Material thickness: 0.5mm, 0.6mm
2.Material width: 300-500mm
3.Drum Diameter: 490±0.5mm (can be customized)
4.Production cycle: 20s
detail
Preview
detail
Preview
ST9: Front cover, back cover, drum wrapper Seaming
1.The pre-assembled drum enters the profiling die of the spin seaming machine
2.The upper profiling die is lowered into the front cover.
3.Synchronous rotation up and down drives the drum to rotate, and the seaming wheel feeds for seaming operation.
4.After the spin seaming is completed, the upper profiling die returns back.
1 Upper and lower profiling die rotation
-Drive: Servo
-Actuating Mechanism: main shaft + bearing
2 Seaming wheel feed
-Actuator: oil-free slide plate + slider
1.Drum height: 200-500mm
2.Drum wrapper thickness: 0.4-0.6 (can be customized)
detail
Preview
detail
Preview
ST11: Drum spider piercing
1.Put the drum wrapper into the profiling blocks for positioning.
2.The drum pressing mechanism moves down to the designated height.
3.The pericing mechanism starts work, after that, the drum pressing mechanism goes back.
1 Lift of drum pressing mechanism
-Drive: servo motor
-Mechanism: Linear module
2 Piercing
-Drive: Hydraulic
1.Piercing diameter: 6-8mm
2.Sheet thickness: 0.4-0.6mm
3.Drum diameter: 490±0.5mm (can be customized)
4.Cycle: 15s
Commercial Components
detail
Preview
detail
Preview
detail
Preview
detail
Preview

Certifications

Name:new high-tech enterprise
prev
1/4
next
img
Preview
Contact Us
Send an E-mail to:support@bincial.com
Home Appliance Front-Loading Washing Machine Drum Production Line
$350000 ~ $398898.07
Chemical industry chain · assembly line and production line · Assembly Line
Model NO.:WM-01
Transport Package:Wooden Cases, Vacuum Packing, Anti-Rust Oil
Origin:China
avatar iconWuxi avatar iconAuthenticated
50-99 EmployeesScientific Research and Technology Services

Top Products from the Supplier

bincial
Negotiation
bincial
Negotiation
bincial
Negotiation
Products
Bincial APPUser Dashboard
About Us
COMPANY PROFILEJoin us
User Agreement
Privacy Policy
CONTACT US
Collab:135-8566-0971
Support:021-61673695
Link:support@bincial.com
Addr.:Lane 1220, Yuqiao Road, Pudong New Area, Shanghai
DownloadAPP
Channels
WeChat
WeChat
Douyin
Kuaishou
Copyright© Shanghai Bozhi Technology Co., Ltd. Shanghai ICP No. 2023012989-4