





Preview
基本信息产品详情证书
基本信息
型号编号 | KKJ |
生产范围 | 产品线 |
传输类型 | 灵活的 |
自动化生产线 | 组装 |
认证 | 总工程师 |
柔性生产 | 智能制造 |
节奏 | 流水生产线 |
保修 | 12个月 |
交通政策包 | 导出包 |
规格说明 | KKJ |
商标 | 小雅 |
起源 | 中国济南 |
产品详情
Product Description
Preview
Horizontal Flaring Machine of steel wheel rim production line
Preview

Preview
The horizontal flaring machine is a special equipment for flaring wheel rims. The machine includes host device, hydraulic system and electric control system, which features simple and reasonable layout, good performance for centering, one-time flaring task can be processed. Its working pressure, working speed and stroke range can be adjusted according to the needs of the process technology. It can be operated by manual mode and automatic mode.
Process Pictures for Reference
Features of the horizontal flaring machine
TRADE Terms
1 Delivery Time
The manufacturing time will be 4-6
months from the date of receipted down payment.1 month for factory testing (buyer come to factory for testing), optimize and customs clearance procedure.
Total need 7 months delivery time.
Loading sea port: Qingdao, China
2 Payment Terms
The payment terms will be T/T L/C based on FOB Qingdao, China trade terms
.
3 Factory Testing
The Buyer can send engineers to Manufacturer's factory for testing those machines before delivery if it is necessary, and the cost of Buyer's engineers including flight, train, hotel and meals shall be at Buyer's own cost.
4 Warranty
The manufacturer shall guarantee the machines are brand new and correspond in all respects with the quality, specifications and performance as stipulated in this agreement, and also guarantee that the machines when correctly mounted and properly operated and maintained, will give satisfactory performance for a period of 12 months.
Process Pictures for Reference
Features of the horizontal flaring machine
TRADE Terms
1 Delivery Time
The manufacturing time will be 4-6
months from the date of receipted down payment.1 month for factory testing (buyer come to factory for testing), optimize and customs clearance procedure.
Total need 7 months delivery time.
Loading sea port: Qingdao, China
2 Payment Terms
The payment terms will be T/T L/C based on FOB Qingdao, China trade terms
.
3 Factory Testing
The Buyer can send engineers to Manufacturer's factory for testing those machines before delivery if it is necessary, and the cost of Buyer's engineers including flight, train, hotel and meals shall be at Buyer's own cost.
4 Warranty
The manufacturer shall guarantee the machines are brand new and correspond in all respects with the quality, specifications and performance as stipulated in this agreement, and also guarantee that the machines when correctly mounted and properly operated and maintained, will give satisfactory performance for a period of 12 months.
Preview

Preview

Preview

Preview

Preview
证书
标题:IATF 16949



Preview