





Preview
基本信息产品详情证书
基本信息
型号 | JCR-6US |
原材料 | PET表示:聚对苯二甲酸乙二醇酯。 |
巴氏杀菌法 | 伸展吹气 |
自动化 | 自动的 |
电脑化 | 计算机化的 |
认证 | CE, ISO9001:2008 |
条件 | 新(的) |
应用 | 瓶子 |
驱动类型 | 电的 |
电压 | 380V/3pH/50Hz 定制版 |
维度 | 5000毫米-2300毫米-2900毫米 |
瓶子形状 | 定制的 |
最大颈直径 | 30毫米 |
最大容器直径 | 105毫米 |
提供的售后服务 | 可服务海外机械的工程师 |
交通总包 | 木箱 |
规格 | 5700公斤 |
商标 | 桑斯威尔 |
起源 | 中国(大陆)江苏省 |
商品编码 | 8477309000 |
生产能力 | 每年50套 |
包装大小 | 1000.00厘米乘以1000.00厘米乘以1000.00厘米 |
包装总重量 | 4000千克 |
包装尺寸 | 1000.00厘米乘以1000.00厘米乘以1000.00厘米 |
包装总重 | 四千千克 |
产品详情
Product Description
Preview
High Speed PET Bottle Blow Molding Machine
Introduction
This SSW-R series model of fully automatic rotary heating stretch blow molding machinery is specially designed for high speed based on absorbing all
international latest technology, it is an economic two stage automatic stretch blow molding machine, mainly used for PET stretch blow bottles. The machine consumes less power due to optimized machine layouts and patented preform heating system, so the end of user can achieve maximun profit in today
's competitive bottle molding market.
Introduction
This SSW-R series model of fully automatic rotary heating stretch blow molding machinery is specially designed for high speed based on absorbing all
international latest technology, it is an economic two stage automatic stretch blow molding machine, mainly used for PET stretch blow bottles. The machine consumes less power due to optimized machine layouts and patented preform heating system, so the end of user can achieve maximun profit in today
's competitive bottle molding market.
Preview

Preview
1. Preform feeding system: Single channel preform feeding and starwheel preform feeding are adopted, which effectively solves the problem of preform blocking and wearing.
2. Revolution system: It adopts special chain and is driven by servo motor, so that the heating unit can move smoothly, with fast positioning and low noise.
3. Heating system: Heating and conveying in the mode of rotary blow molding machine can reduce energy consumption and greatly improve the speed and quality of heating.
4. Mold system: high pressure mold clamping technology is adopted, there is no mold expansion phenomenon, and the mold clamping line is thin. The mold adopts drawer structure, and is positioned with four fixed tie rods on the mold back panel, which can be easily replaced within half an hour.
5. Stretch blow system: the cycle time of the first blow and the second blow can be adjusted. According to the customer's different preforms and different bottle types, each rod can be adjusted individually, with high flexibility.
6. Electric control system: Pneumatic and electrical components are from internationally renowned brands. The touch screen control system is easy to operate, has perfect monitoring and induction settings, has fault diagnosis functions, and automatically calculates reports to master the production efficiency of each shift.
7. Cooling/chilled water circulation system: There is a cooling water channel under the heating box. When the preform is heated, the cooling water channel is used to block the heat of the lamp tube and protect the teeth from deformation. Chilled water leads to the mold, which cools the mold quickly and improves the production efficiency of the whole machine.
2. Revolution system: It adopts special chain and is driven by servo motor, so that the heating unit can move smoothly, with fast positioning and low noise.
3. Heating system: Heating and conveying in the mode of rotary blow molding machine can reduce energy consumption and greatly improve the speed and quality of heating.
4. Mold system: high pressure mold clamping technology is adopted, there is no mold expansion phenomenon, and the mold clamping line is thin. The mold adopts drawer structure, and is positioned with four fixed tie rods on the mold back panel, which can be easily replaced within half an hour.
5. Stretch blow system: the cycle time of the first blow and the second blow can be adjusted. According to the customer's different preforms and different bottle types, each rod can be adjusted individually, with high flexibility.
6. Electric control system: Pneumatic and electrical components are from internationally renowned brands. The touch screen control system is easy to operate, has perfect monitoring and induction settings, has fault diagnosis functions, and automatically calculates reports to master the production efficiency of each shift.
7. Cooling/chilled water circulation system: There is a cooling water channel under the heating box. When the preform is heated, the cooling water channel is used to block the heat of the lamp tube and protect the teeth from deformation. Chilled water leads to the mold, which cools the mold quickly and improves the production efficiency of the whole machine.
Preview

Preview

Preview

Preview

Preview

Preview

Preview

Preview
About Sunswell
Preview

Preview
Set up in 2008, Sunswell leads the market in the field of liquid bottling, blow molding, labeling, packaging machinery and process technology for water, tea, juice, carbonated drinks, energy drinks, liquid, beer, edible oil, dairy and daily care products, etc.
Advantage:
(1)A to Z turnkey plant provider (2)Fully automatic or economic solution optional (3)10+ years of global market experience (4)Serve customers over 50 countries and regions worldwide
Advantage:
(1)A to Z turnkey plant provider (2)Fully automatic or economic solution optional (3)10+ years of global market experience (4)Serve customers over 50 countries and regions worldwide
Preview

Preview

Preview

Preview

Preview

Preview

Preview

Preview
FAQ
Preview
Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 10 years experience.
Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.
Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.
Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If
needed.Or you can arrange engineers to study in our factory. You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units tosave international courier such as DHL, it is really costly.Q7: What is your guarantee?
A7: We have one year guarantee and life-long technical support. Our service also including machine maintence.Q8: What is your payment term?
A8: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also.
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 10 years experience.
Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.
Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.
Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If
needed.Or you can arrange engineers to study in our factory. You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units tosave international courier such as DHL, it is really costly.Q7: What is your guarantee?
A7: We have one year guarantee and life-long technical support. Our service also including machine maintence.Q8: What is your payment term?
A8: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also.
Preview
证书
标题:CE-合格证(灌装线)



Preview
4800bph 500毫升瓶装水生产线纯水灌装机矿泉水生产流水线交钥匙解决方案
¥28960
化工产业链 · 塑料橡胶机械 · 吹塑机
型号JCR-6US
产地中国(大陆)江苏省