




Preview
基本信息产品详情证书
基本信息
型号编号 | NJ508-70 |
认证 | ISO 9001:2000, ISO 9001:2008 |
电源 | 液压的 |
操作压力 | 20MPa |
适用介质 | 液压油 |
结构 | 水平方向 |
材料 | 合金 |
管道范围 | 3 5/8英寸到20英寸 |
低档时的额定扭矩 | 25千牛·米 |
高挡位时的额定扭矩 | 70千牛·米 |
高挡的额定速度 | 每分钟转 12.5r |
低速额定转速 | 每分钟7转 |
最大流 | 每分钟160升 |
重量 | 4800千克 |
维度 | 3010*1400*2090毫米 |
运输包 | 胶合板箱 |
规格 | 杰勒布 |
商标 | 智慧通道 |
起源 | 中国江苏 |
商品编码 | 8413910000 |
生产能力 | 每年 100 个单位 |
包装尺寸 | 3010.00cm * 1400.00cm * 2090.00cm |
包装总重量 | 5000.000kg |
包装尺寸 | 3010.00厘米乘以1400.00厘米乘以2090.00厘米。 |
包装总重量 | 五千公斤 |
产品详情
Product Description
Preview
NJ508-70
thread
tubing/ casing coupling bucking unit
NJ508-70
premium thread
tubing/ casing coupling bucking unit is the special equipment applied to the processing of premium thread
oil pipe. It is also applied to the coupling screw of
the premium thread such as
FOX, NK3SB,VAM,BGT
as well as the common
thread
.
With slight mark and the depth of being less than 0.1mm, the floating arm tong is able to inspect the make-up torque precisely and display the torque of inflection point clearly during the make-up process. It changes speed automatically during the make-up process and the low rotation speed is lower than 10r/min. It is thus applied to the processing demand of premium threads.
NJ508-70
premium thread tubing/ casing
coupling
bucking machine:
The
stepless speed change
can be realized by adjusting the power tong
to rotate in any speed
within
the range of 0.5r/min~12.5r/min in
combination
with
electrical control system and hydraulic power system. During making-up, the speed inversely slows down as the torque increases, it rotates at a high speed when the
torque
is small for the purpose of ensuring the
making-up efficiency, when the torque
is
large, the speed will steadily
slow down, which strictly meets the API Specification, ensuring
the making-up process not exceed the set torque .
thread
tubing/ casing coupling bucking unit
NJ508-70
premium thread
tubing/ casing coupling bucking unit is the special equipment applied to the processing of premium thread
oil pipe. It is also applied to the coupling screw of
the premium thread such as
FOX, NK3SB,VAM,BGT
as well as the common
thread
.
With slight mark and the depth of being less than 0.1mm, the floating arm tong is able to inspect the make-up torque precisely and display the torque of inflection point clearly during the make-up process. It changes speed automatically during the make-up process and the low rotation speed is lower than 10r/min. It is thus applied to the processing demand of premium threads.
NJ508-70
premium thread tubing/ casing
coupling
bucking machine:
The
stepless speed change
can be realized by adjusting the power tong
to rotate in any speed
within
the range of 0.5r/min~12.5r/min in
combination
with
electrical control system and hydraulic power system. During making-up, the speed inversely slows down as the torque increases, it rotates at a high speed when the
torque
is small for the purpose of ensuring the
making-up efficiency, when the torque
is
large, the speed will steadily
slow down, which strictly meets the API Specification, ensuring
the making-up process not exceed the set torque .
Preview

Preview
ZKN-N803
torque control system:
ZKN-N403
torque control system: TPC for short, is an advanced torque signal processing control and record system which can be used to measure, display, record and control torque when making up the tubes so as to ensure the best screw torque is achieved in the tube joints and all curve data of all joints in screw tightening period are stored in the disc for later search.
torque control system:
ZKN-N403
torque control system: TPC for short, is an advanced torque signal processing control and record system which can be used to measure, display, record and control torque when making up the tubes so as to ensure the best screw torque is achieved in the tube joints and all curve data of all joints in screw tightening period are stored in the disc for later search.
Preview

Preview
YDZ160-37 hydraulic
power unit :
power unit :
Preview

Preview

Preview

Preview

Preview

Preview
Q:How can I place order?
A: You can contact us by email or social media like WhatsApp on the
order detail or place order on line.Q:How about the payment?A: For new clients, advance payment(30%-100% of total amount) is required, the balance need to be paid before the delivery after your inspection. Q:How can I pay you?A: By T/T (Telegraphic Transfer) or L/C (Letter of Credit). After you receive the
PI, you can make the payment through your bank as per the terms mentioned in PI. Q: What's the order procedure?
A: First we discuss order details, production details by email ,TM
or other social media; then we issue you an PI for your confirmation. You will be requested to make full payment or deposit before we go into production.After we get the deposit, we start to process the order. Depending on the products you order, we usually a couple of days or even moths to complete production if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we shall arrange the shipment for you.Q: How do you deal with
defective products
received by the clients?
A:
If there are some defective items, we usually credit to our customer or replace
them
in next shipment.
A: You can contact us by email or social media like WhatsApp on the
order detail or place order on line.Q:How about the payment?A: For new clients, advance payment(30%-100% of total amount) is required, the balance need to be paid before the delivery after your inspection. Q:How can I pay you?A: By T/T (Telegraphic Transfer) or L/C (Letter of Credit). After you receive the
PI, you can make the payment through your bank as per the terms mentioned in PI. Q: What's the order procedure?
A: First we discuss order details, production details by email ,TM
or other social media; then we issue you an PI for your confirmation. You will be requested to make full payment or deposit before we go into production.After we get the deposit, we start to process the order. Depending on the products you order, we usually a couple of days or even moths to complete production if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we shall arrange the shipment for you.Q: How do you deal with
defective products
received by the clients?
A:
If there are some defective items, we usually credit to our customer or replace
them
in next shipment.
Preview
证书
标题:API 11D1



Preview