





Preview
基本信息产品详情证书
基本信息
型号/编号 | RW |
水耗 | 每小时1.8立方米(cbm/H) |
电机类型 | 交流电动机 |
电机功率 | 15-37千瓦 |
认证 | ISO,CE |
旋转速度 | 28至19转/分钟 |
保修 | 十二个月 |
售后服务 | 偏好服务 |
产品名称 | 矿用洗矿机-旋转滚筒式洗矿机 |
安装 | 工程师指南 |
售后服务 | 海外工程师待命 |
模型 | Dtx1030 |
鼓的尺寸 | 1000*3000mm |
屏幕尺寸 | 小于20毫米 |
饲喂大小 | 小于80毫米 |
重量 | 3800公斤 |
运输包 | 标准出口包装 |
规格 | 屏幕孔尺寸:小于20/25/50毫米 |
商标 | 恒昌 |
起源 | 中国 |
商品编码 | 8474809090 |
生产能力 | 每月300套/组 |
产品详情
Product Description
Preview
Ore Washing Machine Rotary Drum Washer for Ore Washing Plant
1.Product Application
Adopting foreign technology, GTX Series ore washing machines have single layer or double layers circular sieve to classify two to three kind different grades sand and stone which should be clearly deslimed .It is mainly used for washing ore before beneficiation operation system, and improving the ore grade for next processing step. It can be used for manganese ore, iron ore, limestone, tungsten, and silica ore, and etc.
1.Product Application
Adopting foreign technology, GTX Series ore washing machines have single layer or double layers circular sieve to classify two to three kind different grades sand and stone which should be clearly deslimed .It is mainly used for washing ore before beneficiation operation system, and improving the ore grade for next processing step. It can be used for manganese ore, iron ore, limestone, tungsten, and silica ore, and etc.
Preview

Preview
2.Main Features
(1). adopt the most advanced international technology, make it has an excellent performance
(2).the single or double layers of the circular sieve which can classify two or three different grade of sand.(3).low energy consumption and easy maintenance.
(1). adopt the most advanced international technology, make it has an excellent performance
(2).the single or double layers of the circular sieve which can classify two or three different grade of sand.(3).low energy consumption and easy maintenance.
Preview

Preview

Preview
3.Working Principle
The slurry material feeds into the drum where it is vigorously scrubbed, the soil matrix is broken up and the taaarget mineral is released. The material is then screened through the rotating screen and waste is ejected. The screened material is then passed on to the concentrating modules for upgrading.
4.Technical Specifications
5. Packing and shipping
The slurry material feeds into the drum where it is vigorously scrubbed, the soil matrix is broken up and the taaarget mineral is released. The material is then screened through the rotating screen and waste is ejected. The screened material is then passed on to the concentrating modules for upgrading.
4.Technical Specifications
5. Packing and shipping
Preview

Preview
6 Our company
Hengchang headquarters is located in the industrial park in Gongyi City.
riveting machine, welding equipment and assembly equipment.
Hengchang headquarters is located in the industrial park in Gongyi City.
riveting machine, welding equipment and assembly equipment.
Preview

Preview

Preview
7.Our Workshop
1.We are factory and be able to give you the lowest price than market one;
2.Our products have been exported to over 80 countriesand widely used in global mining and construction industry;
2>How long is your delivery time?
7-10 days for the stock, 15-30 days for the mass production.
3>What is your payment method?
30% deposit in T/T advance, 70% balance before shipment. 4>How long is the warranty? Does your company supply the spare parts? 3 year. Spare parts for you at lowest cost. 5>If I need the complete crushing plant can you help us to build it? Yes, we can help you set up a complete production line and give you related professional advice. We had already build many mining projects in China & Overseas.
1.We are factory and be able to give you the lowest price than market one;
2.Our products have been exported to over 80 countriesand widely used in global mining and construction industry;
2>How long is your delivery time?
7-10 days for the stock, 15-30 days for the mass production.
3>What is your payment method?
30% deposit in T/T advance, 70% balance before shipment. 4>How long is the warranty? Does your company supply the spare parts? 3 year. Spare parts for you at lowest cost. 5>If I need the complete crushing plant can you help us to build it? Yes, we can help you set up a complete production line and give you related professional advice. We had already build many mining projects in China & Overseas.
Preview
证书
标题:新的认证书



Preview