





Preview
基本信息产品详情证书
基本信息
型号/编号 | FG&FC系列 |
重量 | 根据不同模型 |
材料 | 钢 |
材料特性 | 耐用,耐腐蚀 |
认证 | ISO9001:2008, CE, SGS |
节能 | 节能 |
保修 | 两年 |
颜色 | 多种颜色 |
定制的 | 定制或模型 |
条件 | 新(的) |
售后服务 | 工程师指导/视频指导 |
用法 | 分类、洗涤、脱泥和脱水 |
带减速器的马达 | 是的 |
螺旋数量 | 单数或双数类型 |
备件 | 供给 |
运输包 | 出口包装标准 |
规格 | 不同于不同的模型 |
商标 | 盖林 |
起源 | 中国 |
生产能力 | 每月1200套 |
包装尺寸 | 这个长度为 280.00厘米 x 78.00厘米 x 150.00厘米。 |
包装总重量 | 1300千克 |
包装大小 | 280.00厘米 * 78.00厘米 * 150.00厘米 |
包装总重量 | 1300公斤 |
产品详情
Sand Washer In Iron Ore Processing Plant Screw Spiral Sand Washing Machine
Preview
Product Description
Preview
2.Use high quality iron steel materials for durable working and low maintenance rate;
Product Parameters
Product Parameters
Preview

Preview
1.Main Shaft
2.Bearing Seat
3.Belt Pulley
4.Speed Reducer
5.Movable Support
6.Discharge Port
7.Screw Blade
8.Rotary Shelf
9.Rotray Shelf Foundation
10.Shell
11.Main Frame
12.Horizontal Grest of Weir
13.Overflow Silo
14.Main Lifter
15.Lifter Support
The (left, right) spirals driven by the transmission mechanism rotates in the water tank. The finely grained slurry enters the water bank from the feed inlet at one side and forms one slurry precipitation zone, whose surface area and volume depends on the value of the water tank's inclination angle and the height of overflow edge. The spirals rotating at a low speed play a certain stirring role. After the slurry is stirred, the light and fine particles float above the surface and overflow from the overflow edge. Then they flow into the next working procedure of ore dressing. The heavy and thick particles sink into the bottom of the water tank and become return sand which is transported by the spirals to the ore discharge mouth for discharge.
2.Bearing Seat
3.Belt Pulley
4.Speed Reducer
5.Movable Support
6.Discharge Port
7.Screw Blade
8.Rotary Shelf
9.Rotray Shelf Foundation
10.Shell
11.Main Frame
12.Horizontal Grest of Weir
13.Overflow Silo
14.Main Lifter
15.Lifter Support
The (left, right) spirals driven by the transmission mechanism rotates in the water tank. The finely grained slurry enters the water bank from the feed inlet at one side and forms one slurry precipitation zone, whose surface area and volume depends on the value of the water tank's inclination angle and the height of overflow edge. The spirals rotating at a low speed play a certain stirring role. After the slurry is stirred, the light and fine particles float above the surface and overflow from the overflow edge. Then they flow into the next working procedure of ore dressing. The heavy and thick particles sink into the bottom of the water tank and become return sand which is transported by the spirals to the ore discharge mouth for discharge.
Preview
Detailed Photos
Preview

Preview
Application
Preview

Preview
Packaging & Shipping
Preview

Preview
Company Profile
Preview

Preview

Preview
One Stop solution for beneficiation plant service:
1.Engineering consulting available,it makes clients have a comprehensive understanding of beneficiation plant,including mine value,useful elements,mineral processing technology,plant scale,essential equipments,etc.
2.Arrange mineral beneficiation experiment after received the material sample and beneficiation test report will be done after test.
3.After reaching agreement with client,we start to engineering design,including planning,investigation,data collection, project evaluation etc. and then comes up with design scheme of beneficiation plant construction and working drawings.
1.Engineering consulting available,it makes clients have a comprehensive understanding of beneficiation plant,including mine value,useful elements,mineral processing technology,plant scale,essential equipments,etc.
2.Arrange mineral beneficiation experiment after received the material sample and beneficiation test report will be done after test.
3.After reaching agreement with client,we start to engineering design,including planning,investigation,data collection, project evaluation etc. and then comes up with design scheme of beneficiation plant construction and working drawings.
Preview
FAQ
Preview
Q: What is your payment terms? A: By TT(Telegraphic Transfer), 100% or 40% Deposit before production and 60% balance payment
paid off
before loading from factory.
paid off
before loading from factory.
Preview

Preview
证书
标题:证书



Preview