





Preview
基本信息产品详情证书
基本信息
型号编号 | BZ-PP |
类型 | 扁平的 |
材料 | PP |
成型方法 | 挤压 |
应用程序 | 函数式组件 |
材料属性 | 高影响力 |
服务市场 | 建筑与建设 |
定制的 | 非定制的 |
用法 | 外部 |
颜色 | 单一颜色 |
表面处理 | 完成 |
证书 | ISO9001:2015 |
厚度 | 12-21毫米 |
可重复使用次数 | 五十倍 |
优势 | 防水轻便 |
运输包 | 货盘 |
规格 | 1220乘以2440毫米除以915乘以1830毫米 |
商标 | 备注 |
起源 | 中国 |
商品编码 | 3925900000 |
生产能力 | 每天1000件 |
包装尺寸 | 2.45cm * 1.25cm * 1.00cm |
包装总重量 | 1400 千克 |
包装尺寸 | 2.45cm * 1.25cm * 1.00cm |
包装总重量 | 1400.000公斤 |
产品详情
Product Description
Preview
Product Specification
Preview

Preview
Cutting and customized size are available.
Preview
Product Advantages
Preview
1. Durable, the
reusable time
can reach more than
60 times, long service life.2. No
absorption of moisture, no deformation, no mildew;
Long-term immersion stratification in the water,
no bubbles,
sheet size stability, especially suitable for underground and damp environment.3.Demould
easily. No need
brushing release agent,
only
tapping,
the formwork
will
fall off.Shorten working
hours
and
speed up the construction schedule
efficiently.4. Easy
to
process. Sawing, drilling
and nailing are all available.Formworks can be combined
vertically
and horizontally optionally.5.Light weight,
high
strength,
high
hardness, impact resistance, wear resistance.
6.Surface is smooth, bright and clean;
concreting and forming
effect is good.
7.Good toughness.It could be used as
cambered
special-shaped formwork.
8.Acid and alkali resistance, corrosion resistance;
Very suitable for
the
engineeringapplication
in
coastal
areas,
mine,
as well as seawall.It is
need not do any preservative treatment
both in using and
storing the formwork,
which
do not
pollute the concrete surface.
9.Waste products can be recycled and
reprocessed,
making
full use of waste materials.This property
can greatly
reduce
the project cost
compared with wooden formwork and bamboo formwork.
10.Environmental protection and energy saving, no pollution.No
any poisonous
or
harmful gas.
11.Easy to remove.Removing is
convenient, quick and safe,
and the
supporting
is
also
easy to operate,
advantageous
to the organization
construction, effectively improving
the construction schedule.
reusable time
can reach more than
60 times, long service life.2. No
absorption of moisture, no deformation, no mildew;
Long-term immersion stratification in the water,
no bubbles,
sheet size stability, especially suitable for underground and damp environment.3.Demould
easily. No need
brushing release agent,
only
tapping,
the formwork
will
fall off.Shorten working
hours
and
speed up the construction schedule
efficiently.4. Easy
to
process. Sawing, drilling
and nailing are all available.Formworks can be combined
vertically
and horizontally optionally.5.Light weight,
high
strength,
high
hardness, impact resistance, wear resistance.
6.Surface is smooth, bright and clean;
concreting and forming
effect is good.
7.Good toughness.It could be used as
cambered
special-shaped formwork.
8.Acid and alkali resistance, corrosion resistance;
Very suitable for
the
engineeringapplication
in
coastal
areas,
mine,
as well as seawall.It is
need not do any preservative treatment
both in using and
storing the formwork,
which
do not
pollute the concrete surface.
9.Waste products can be recycled and
reprocessed,
making
full use of waste materials.This property
can greatly
reduce
the project cost
compared with wooden formwork and bamboo formwork.
10.Environmental protection and energy saving, no pollution.No
any poisonous
or
harmful gas.
11.Easy to remove.Removing is
convenient, quick and safe,
and the
supporting
is
also
easy to operate,
advantageous
to the organization
construction, effectively improving
the construction schedule.
Preview

Preview

Preview

Preview

Preview
Instruction of using Beizhu plastic formwork and H20 beam:
1. Use method is the same as wooden formwork, hollow plastic formwork and batten should be in cross shaped;
2. No need to brush the mold release agent before using formwork;
3. The distance between timbers for 18mm thickness: (A) According to the thickness of the slab concrete, if the
thickness of slab concrete is less than 15cm, the timbers distance should be 350-400mm. If the thickness of slab
concrete is more than 15cm, the distance should be 300-350mm. (B) The distance between timbers of the shear
wall is adjusted by the height and thickness of the wall. For example, the wall is 2800 mm high and 300 mm thick,
timbers distance should be 200-250 mm with 18mm thick plastic formwork. If the shear wall width or the pillar is
thick more than 1m, must add the fixed frame.
4. There shouldn't be gaps between the die shear wall and column combining, there must be timbers in internal
angle (the bottom of the wall) beam to insure the beam frame, wall and formwork connect well. For shear wall,
formwork must be assembled into the whole piece, then hoisting, adjust to be straight. This way can reduce
labor intensity, as well as improve the forming effect.
5. When nailing the formwork and H20 beam, the distance away from formwork edge should be 15-30 mm, the
strength of driving in nail should be moderate; length of nails should be 40-50 mm, not too long or too short.
6. There must be a 15mm seam alowance for the wood in the beam bottom, make the wallboard stand on seam
allowance of wood square, thus can ensure no leakage of slurry and save wallboard material efficiently.
7. Please avoid the peak temperature in one day when matching the mold. Then the effect after releasing mould
is better. Normally, there is no space between formworks, but if the temperature difference is 5-10ºC, then should
reserve 1-2mm gap.
8. Please place the PP formwork as flat as plywood formwork after releasing the mould.
1. Use method is the same as wooden formwork, hollow plastic formwork and batten should be in cross shaped;
2. No need to brush the mold release agent before using formwork;
3. The distance between timbers for 18mm thickness: (A) According to the thickness of the slab concrete, if the
thickness of slab concrete is less than 15cm, the timbers distance should be 350-400mm. If the thickness of slab
concrete is more than 15cm, the distance should be 300-350mm. (B) The distance between timbers of the shear
wall is adjusted by the height and thickness of the wall. For example, the wall is 2800 mm high and 300 mm thick,
timbers distance should be 200-250 mm with 18mm thick plastic formwork. If the shear wall width or the pillar is
thick more than 1m, must add the fixed frame.
4. There shouldn't be gaps between the die shear wall and column combining, there must be timbers in internal
angle (the bottom of the wall) beam to insure the beam frame, wall and formwork connect well. For shear wall,
formwork must be assembled into the whole piece, then hoisting, adjust to be straight. This way can reduce
labor intensity, as well as improve the forming effect.
5. When nailing the formwork and H20 beam, the distance away from formwork edge should be 15-30 mm, the
strength of driving in nail should be moderate; length of nails should be 40-50 mm, not too long or too short.
6. There must be a 15mm seam alowance for the wood in the beam bottom, make the wallboard stand on seam
allowance of wood square, thus can ensure no leakage of slurry and save wallboard material efficiently.
7. Please avoid the peak temperature in one day when matching the mold. Then the effect after releasing mould
is better. Normally, there is no space between formworks, but if the temperature difference is 5-10ºC, then should
reserve 1-2mm gap.
8. Please place the PP formwork as flat as plywood formwork after releasing the mould.
Preview

Preview
Company Profile
Preview
Beizhu Plastic Formwork Company
Beizhu Plastic Formwork Company
was founded in 2008, is located in Suqian City,which is one of the
largest manufacturers of construction plastic formwork in China. Beizhu has production
area about 12000
square meters, 5 production lines and 100 workers.
The construction plastic formwork
has been exported to Finland, Canada, Australia, Russia, Ukraine, KenyaThailand, Korea
and so on. Now Beizhu has 2 agents in Turkey and Thailand.
In 2013
year,Beizhu adopted the Certificate of ISO9001:2008 International Quality Management System.Beizhu keeps
long-term cooperation with all the customers all over the world.
Beizhu Plastic Formwork Company
was founded in 2008, is located in Suqian City,which is one of the
largest manufacturers of construction plastic formwork in China. Beizhu has production
area about 12000
square meters, 5 production lines and 100 workers.
The construction plastic formwork
has been exported to Finland, Canada, Australia, Russia, Ukraine, KenyaThailand, Korea
and so on. Now Beizhu has 2 agents in Turkey and Thailand.
In 2013
year,Beizhu adopted the Certificate of ISO9001:2008 International Quality Management System.Beizhu keeps
long-term cooperation with all the customers all over the world.
Preview

Preview
证书
标题:TUV certificate



Preview