Product






Preview
Basic Info.Product DescriptionCertifications
Basic Info.
Model NO. | B Type |
Weight | 1.5kg |
Quality Guarantee Period | 6 Month |
Storage Environment | Dry Environment |
Product Specifications | 70mmw X 550mml |
Package Specifications | 720*150*200mm |
Transport Package | Carton & Vacuum Packing |
Specification | 10/20pcs |
Trademark | WYC |
Origin | China |
Production Capacity | 100000PCS/Month |
Product Description
Product Description
Preview

Preview

Preview

Preview
Components
PILE HEAD CUTTER("PHC")
Bracket
De-bonding foam
1.PHC
a) Type ES-35mmWx600mml
b) Type S-45mmlWx700mml
c) Type B-70mmWx550mml
2.Steel Reinforcement De-Bonding Covers
Various sizes - From Φ16mm to Φ40mm
3.Steel Brackets
a)Type ESB
b) Type SB
c) Type BB
d) Type DBB
PILE HEAD CUTTER("PHC")
Bracket
De-bonding foam
1.PHC
a) Type ES-35mmWx600mml
b) Type S-45mmlWx700mml
c) Type B-70mmWx550mml
2.Steel Reinforcement De-Bonding Covers
Various sizes - From Φ16mm to Φ40mm
3.Steel Brackets
a)Type ESB
b) Type SB
c) Type BB
d) Type DBB
Preview

Preview

Preview

Preview
4.Plastic bag
a) 5C-W130mm-L1100mm
b) 5C-W140mm-L1400mm
Installation Procedure
1.The PHC materials are fixed to the steel
Reinforcement cage prior to lowering the cage into the bored hole for concerting.2.The PHC are initially fitted to the steel brackets.3.The brackets are then fixed to the steel reinforcement cage,with the PHC at the level that the crack should form in the pile head.4.Install de-bonding covers to all the steel
Reinforcement starter bars above the PHC.5.The installation of the PHC is complete and ready to be installed into the bored hole for concreting.Pile Head Removal
1.After concreting, wait 4 to 5 days for crack to form at the pile head.2.When the crack at pile head has formed, the pile head can be removed by lifting it off with crane, when necessary with the aid of an excavator.CONFIGURATION OF PHC FOR EACH PILE SIZE
a) 5C-W130mm-L1100mm
b) 5C-W140mm-L1400mm
Installation Procedure
1.The PHC materials are fixed to the steel
Reinforcement cage prior to lowering the cage into the bored hole for concerting.2.The PHC are initially fitted to the steel brackets.3.The brackets are then fixed to the steel reinforcement cage,with the PHC at the level that the crack should form in the pile head.4.Install de-bonding covers to all the steel
Reinforcement starter bars above the PHC.5.The installation of the PHC is complete and ready to be installed into the bored hole for concreting.Pile Head Removal
1.After concreting, wait 4 to 5 days for crack to form at the pile head.2.When the crack at pile head has formed, the pile head can be removed by lifting it off with crane, when necessary with the aid of an excavator.CONFIGURATION OF PHC FOR EACH PILE SIZE
Preview

Preview

Preview

Preview

Preview
Q:
Why
choose
our
product?
A:
Reduce
labor
costs,
improve
efficiency,
save
time,
reduce
noise,
and
be
more
environmentally
friendly.
Q:
Are
you
a
manufacturer?
A:
Yes,our
factory
was
established
in
2011
and
we
have
our
own
trading
company.
Q:
What's
the
MOQ
and
payment
terms?
A:
MOQ
is
20
pieces.Payment
via
T/T.
Q:
How
about
delivery
time?
A:
15-30
work
days
after
the
payment,
and
also
depend
on
your
quantity.
Q:
How
long
is
the
shelf
life
of
the
product?
A:
In
a
dry
environment
6-8
month.
Q:
Which
country
have
you
exported?
A:
Most
Southeast
Asian
countries.
Why
choose
our
product?
A:
Reduce
labor
costs,
improve
efficiency,
save
time,
reduce
noise,
and
be
more
environmentally
friendly.
Q:
Are
you
a
manufacturer?
A:
Yes,our
factory
was
established
in
2011
and
we
have
our
own
trading
company.
Q:
What's
the
MOQ
and
payment
terms?
A:
MOQ
is
20
pieces.Payment
via
T/T.
Q:
How
about
delivery
time?
A:
15-30
work
days
after
the
payment,
and
also
depend
on
your
quantity.
Q:
How
long
is
the
shelf
life
of
the
product?
A:
In
a
dry
environment
6-8
month.
Q:
Which
country
have
you
exported?
A:
Most
Southeast
Asian
countries.
Preview
Certifications
Name:发明专利

Preview
Soundless Pile Head Removal Solution
$7.8 ~ $8.18
Chemical industry chain · Chemical additives and catalysts · Soundless Cracking Agent
Model NO.:B Type
Transport Package:Carton & Vacuum Packing
Origin:China


Less than 50 EmployeesAgriculture/Forestry/Animal Husbandry/Fishing