Product






Preview
Basic Info.Product DescriptionCertifications
Basic Info.
| Model NO. | Wellhead Tree Tee/Cross |
| Connection Form | Flange |
| Well Type | Oil Well |
| Installation Position | Ground |
| Structure | Customized |
| Type | Petroleum Drilling Machine |
| Machine Type | Wellhead Tree Tee/Cross |
| Application1 | Energy & Mining/Petroleum Machinery Parts |
| Transport Package | Wooden Box |
| Specification | CUSTOM MADE |
| Trademark | JX PETRO |
| Origin | Dongying |
| HS Code | 84314310 |
| Production Capacity | 2000PCS/Month |
Product Description
Product Description
Preview

Preview
Studded tees and crosses are very important components for wellhead assembly christmas tree. They are assembled on the X-max tree where an angled connection is required. They are made from solid metal block. Boundary dimensions-bore and centerline-to-face dimension shall conform to API 6A standard. Common configurations include 4 way, 5 way, and 6 way crosses along with ells and trees with pressure ratings from 2000 to 20000 psi.
(1). The basic material is usually AISI 4130 Alloy Steel or AISI 410 Stainless Steel.
(2). Overlays like SS 316L or inconel 625 on ring groove can be incorporated for corrosion resistance.
(3). Studded / Flanged crosses and tees shall undergo hydrostatic body test and drift test as per API 6A standards prior to delivery.
(4). Custom sizes and specifications are available upon request.
(5). Simple structure with reliable performance.
Hot Sales Products
(1). The basic material is usually AISI 4130 Alloy Steel or AISI 410 Stainless Steel.
(2). Overlays like SS 316L or inconel 625 on ring groove can be incorporated for corrosion resistance.
(3). Studded / Flanged crosses and tees shall undergo hydrostatic body test and drift test as per API 6A standards prior to delivery.
(4). Custom sizes and specifications are available upon request.
(5). Simple structure with reliable performance.
Hot Sales Products
Preview
Company Profile
Preview

Preview
Packaging & Shipping
Preview

Preview
FAQ
Preview

Preview
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Western Union are the most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Western Union are the most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.
Preview
Certifications
Name:API 11B

Preview
Studded Cross for Chokeand Kill Manifold
$1000 ~ $4986.23
Chemical industry chain · Petroleum equipment and apparatus · Wellhead Tree
Model NO.:Wellhead Tree Tee/Cross
Transport Package:Wooden Box
Origin:Dongying
Dongying
AuthenticatedLess than 50 EmployeesOther Manufacturing Industries



